“Actually, it’s probably important to state that I don’t think the majority of these projects are doing anything untoward I just don’t think any of them realized how difficult it is to build a data center, and unlike basically any other problem the tech industry has ever faced, simply throwing as much money as possible at it doesn’t really change the limits of physical construction.”
Our reading, the sentence that was checked:
Zitron does not think the majority of these data center projects are doing anything untoward; he thinks none of the builders realized how difficult it is to build a data center, and throwing as much money as possible at it does not really change the limits of physical construction.
Assessment: Can’t be checked Not checked against evidence
Where and when Ed Zitron wrote it
Where's Your Ed At, Where Are All The Data Centers?, paragraph 185.
- Said
- Source observed
- live page, full text, public
- Evidence
- Not checkedboth screens found it cannot be checked
- Assessment recorded
- assessment wyea-where-are-all-the-data-centers-f42eb6-a1
We recorded 15 claims from this post. See every claim from this post.
The wording above is the version this site observed on 2026-10-28. The source may have been edited after 2026-05-12. This page does not claim the wording was captured then.
What the claim commits to
- Kind
- Causal claim
- Deadline, as the speaker wrote it
- None stated. This site does not add one.
- Deadline state when assessed
- No horizon
- Deadline state on 2026-10-29
- No horizon (the release’s reference date)
Conditions
- I don't think / I just don't think (qualifier, stated by the speaker)
- the majority of these projects (scope, stated by the speaker)
From the speaker
- I don't think / I just don't think
- the majority of these projects
Our interpretation
None added.
This claim is not graded on evidence. The record checks that the words are quoted correctly and attributed to the right person, and that the claim is classified correctly.
Current assessment
Not graded on evidence
Outcome: Can’t be checked
Both AI providers screened this claim on their own and found that public evidence could not settle it. It is recorded and attributed, not scored.
Why it can’t be checked
Both screens gave the same reason:
- About something no public evidence could show, such as a private intention or a counterfactual.
- Evidence
- Not checked
- Deadline state when assessed
- No horizon
- Assessment recorded
- Policy version
- 2026-10-28.7
Rationale
Not checked against evidence. Two independent screens, one from each provider, both found this about something no public evidence could show, such as a private intention or a counterfactual.
Limitations
None recorded.
Evidence (0 items)
No evidence was searched for. Both screens found that public evidence could not settle this claim.
Where it was said (1)
Said once in the sources this register covers.
: Where's Your Ed At, Where Are All The Data Centers?
Actually, it’s probably important to state that I don’t think the majority of these projects are doing anything untoward I just don’t think any of them realized how difficult it is to build a data center, and unlike basically any other problem the tech industry has ever faced, simply throwing as much money as possible at it doesn’t really change the limits of physical construction.
- Where
- paragraph 185
- Published
- 2026-05-12
- Source observed
- , live page
- Access
- full text, public
History
Assessment versions
- Assessment wyea-where-are-all-the-data-centers-f42eb6-a1: Current. Outcome: Can’t be checked. Not checked against evidence. Public date not recorded.
Recorded events
Assessment publishedBy this site
First assessment published after both reviews and the final-text check passed.
About assessment wyea-where-are-all-the-data-centers-f42eb6-a1.